New Future for an Old Idea: Let’s Talk Block Caving

As digital transformation is on everybody’s lips, block cave mining presents an interesting new idea.  In this new five-part series Firouz Khodayari, PhD, P.Eng. provides a closer look on block cave mining where to start; footprint and Best Height of Draw (BHOD); material flow; mining sequence and production schedule; and, very important, continual updating, monitoring, and improving operations throughout the mine’s life.

Underground minin

 

L​​​​​​​et’s talk Block Caving, because for all the industry talk nowadays of digital transformation, block cave mining presents an interesting new idea. The basic underground operation hasn’t changed in many decades. What has changed are current economics, digital tools and new modeling methods to better plan and manage operations.

Imagine an open pit and heavy machines hauling material up from increasing depths. Now imagine an underground mirror image. In this image, a vertical (or close to vertical) underground column of ore is undermined from below to coll​​​​​​​apse under its own weight and loaded in vehicles and conveyors that haul the material to the surface.

Block cave mining is becoming increasingly attractive for open pit operations struggling to find orebodies close to the earth’s surface. And for new projects, cave mining requires a much smaller footprint and generates less waste.

 

Mitigating Uncertainty

Generally best suited for lower grade ore reserves, block caving involves an elaborate pre-construction process that can take several years to develop, with considerable upfront capital expenditure. However, once production begins, the cost of block cave mining is as low as open pit mining, about one-tenth the cost of conventional underground methods. Production rates can reach 30,000 to 100,000 tons per day, a comparable rate for an open pit processing plant. Drilling and blasting costs are far less, and there are no backfilling costs. Block caving sharply reduces surface waste disposal compared with open pit operations because the amount of waste rock generated from block caving is far less.

Still, block cave production often entails uncertainties. In early stages of caving projects, little is known about underground orebody characteristics.

Continue reading the full exclusive article in the GEOVIA User community

 

 

The GEOVIA User community: a community by and for GEOVIA users

Discover the community of reference for GEOVIA peer-to-peer support, materials and expert insights!

  • Get started and make the most of your GEOVIA software
  • Become an expert in your domain of interest
  • Share your knowledge and experience
  • Get help from experienced users

New member? Create an account, it’s free!

Learn more about this community HERE.

Firouz Khodayari

Firouz Khodayari​​​​​​​ is an industry consultant, author, and professional engineer with a PhD in mining engineering and more than a decade of international mine planning and optimization experience. He specializes in mathematical modelling and production schedule optimization for open pit and underground mining